Development History

Home > Company > Development History

Development history

In 2005, Desheng Nickel Industry Co., Ltd. was established and began to constructed.

In 2009, the main processes, such as blast furnace, steel making and hot rolling, were completed and put into trial production.

In 2010, Desheng Nickel signed a restructuring agreement with Baosteel Group.

In 2011, Baosteel Desheng officially unveiled

In 2012, 4# submerged arc furnace was put into operation. 

In 2013, 3#, 2#, 1# submerged arc furnaces was put into operation.

In 2014, BN1TP (tubing products) and BD11 (medium nickel product) were developed successfully.

In 2015, DRAP unit of cold-rolling plant was tested in hot load.

In 2016, 400 series ferrite products and low carbon austenitic products were successfully developed.

In 2017,the company’s output value exceeds ten billion yuan.

In 2018, HRAPL unit of cold rolling mill successfully rolled the first roll of black rolls.

5.7 million-ton industrial planning of Baosteel Desheng passed the review of the Board of Directors of China Baowu.

Quality Stainless Steel Green Industry Base of Baosteel Desheng was under construction.


Copyright © 2019 Baosteel Desheng Stainless SteelCo., Ltd. 闽ICP备09041973号-1
百度 搜狗 360搜索 循环歌单|【八方来财】|“【来财の小曲】谁懂憋佬仔出来时的救赎感” 潘玮柏今晚再来大闹一场 如何评价张国立、佟大为、梅婷主演的电视剧《我的后半生》? 网红洋媳妇“阿根廷奇娜”去世 曾登上央视舞台 争议Android“假开源真封闭”:开发者们该何去何从?

      <code id='c3020'></code><style id='d7e44'></style>
    • <acronym id='7fe96'></acronym>
      <center id='915ca'><center id='ba7ad'><tfoot id='3fd4f'></tfoot></center><abbr id='71d5e'><dir id='ce5ef'><tfoot id='d4f44'></tfoot><noframes id='d3680'>

    • <optgroup id='5b767'><strike id='3f40b'><sup id='44fed'></sup></strike><code id='fd661'></code></optgroup>
        1. <b id='43dd6'><label id='5bc4b'><select id='8e73b'><dt id='370a0'><span id='375ab'></span></dt></select></label></b><u id='bc392'></u>
          <i id='ecb1e'><strike id='f7643'><tt id='af133'><pre id='db270'></pre></tt></strike></i>